The design of the vessel has been developed by the Norwegian design company HAV Design in cooperation with ESVAGT, and the vessel will be the third turn-key project for Cemre to build for Esvagt. This pioneering project will change the path of the offshore wind service and support the market to reach carbon-neutral and environmentally friendly solutions.
The SOV will be powered by batteries and dual fuel and pure methanol engines, capable of sailing on renewable e-methanol, produced from wind energy and biogenic carbon, which will lead to a yearly emission reduction of approx. 4,500 tonnes of CO2. These systems will provide the required power for the vessel's propulsion, positioning, and main operations while acting carbon neutral and making it possible to create a new “green vessel” trend in the operations. This 93-meter-long innovative vessel will provide accommodations for 124 persons and will be built according to DNV classification rules and sails under the Danish flag. The SOV will serve the world’s largest offshore wind farm, Hornsea 2 located off the UK’s Yorkshire coast in the North Sea.
This new state-of-the-art ESVAGT SOV will provide high comfort standards to the crew and technicians on board also providing space for recreational activities including fitness facilities, game rooms, cinemas, and individual accommodations.
The vessel will provide a highly efficient workspace together with the safe transfer of the technicians at the wind farm via a motion-compensated gangway and transfer boats as well as a crane to lift heavy spare parts. The SOV will also be equipped with a helicopter deck for fast and easy access and transfer from shore.